About the build
The existing bungalow on this land was demolished to make way for the excavation for a 400m2 basement to be constructed. The basement would contain a fully functional gym, fitted with a sauna and steam room, a bar and snooker room.
A CETCO waterproofing system was used to adhere to the formwork to create a watertight building. This was paired with waterproof concrete to offer a two-system waterproof protection as stated by the client. After six weeks the basement was completed, ahead of schedule, and the project was handed back to the principal house builder, allowing him plenty of breathing room to fulfil his schedule.